Miller Correction in Oasys 2 Beta


I wonder if you can help me. I have successfully entered data for a patient and produced reports. However, I have realised that the first set of readings (which were form 2004 and never analysed) need Miller Correction. However, when I have tried to edit the record, the icon is not available nor are any relevant drop down menu choices. I tried creating a new record to adjust from the beginning but with the same problem.
Oasys, Specialist, 5/7/2008, 5/7/2008,

Hi. This process isn't amazingly intuitive, but it can be done very easily.

1. Click on "File - Open" from the main menu and open a ".ODF" file (".OD1" are already linearised so would not be relevant). The Miller Correction button is now grayed out and cannot be clicked.

2. Click on "Record - Max,Min,Mean(Day Interpretation)" from the main menu. The graph window opens at this point.

3. Now the graph window is open the Miller Correction button is no longer grayed out and can be used as normal.
5/7/2008

Please sign in or register to add your thoughts.


Oasys and occupational asthma smoke logo